by visbox | Mar 1, 2019 | Uncategorized
A VisCube C4-4K CAVE was installed for the GRUVE Lab at NASA Glenn Research Center. The system replaces an old CAVE that was installed in...
by visbox | Sep 28, 2018 | Uncategorized
A VisCube C4-4K CAVE was installed for a corporate client in Cambridge, MA.
by visbox | Apr 12, 2018 | Uncategorized
A second VisCube M4 CAVE was installed at the Hong Kong Institute of Vocational Education (IVE) at the Chai Wan campus. Read...
by visbox | Sep 8, 2017 | Uncategorized
A VisCube C4 CAVE was installed for Dr. Sederick Rice at the University of Arkansas at Pine Bluff. (Link to UAPB News...
by visbox | Aug 3, 2017 | Uncategorized
A VisCube M4 CAVE was installed at the Mechanical & Aerospace Engineering department at California State University Long Beach. (Link to Beach CAVE Lab...
by visbox | Jul 21, 2017 | Uncategorized
A VisCube C4 CAVE was installed for Prof. Karen Chen at the Department of Industrial & Systems Engineering at NC State...