A VisWall-9HD was installed at the Center for Computational Research at the University at Buffalo. The new VisWall replaces the VisWall-20X that was installed at CCR in 2002.
Recent Posts
- VisCube M4 CAVE installed in Guangzhou
- New Product: VisCube M4-6K
- VisCube C4-4K CAVE installed
- VisCube M4 CAVE installed at Missouri
- VisCube M4 CAVE installed at CSU
- VisCube M4 CAVE installed at CIDESI
- VisCube M4 CAVE installed
- New Product: VisCube C4-4KU
- VisCube C1 installed at Petronas
- VisCube M4 CAVE installed at LCCC